| RAW MATERIAL |
| |
Incoming raw material is Lab tested at entry level to the plant |
| |
|
| BLANKING |
| |
The Quality of Blanks are checked for primary conformity |
| |
|
| FORGING |
| |
The forging Die is Inspected for good forging out put |
| |
|
| TRIMMING |
| |
Good finished products are selected after Trimming stage |
| |
|
| PUNCHING |
| |
Inspection at punching stage rejects poorly finished goods |
| |
|
| BROACHING |
| |
After broaching all spanners are checked for Jaw accuracy |
| |
|
| HEAT TREATMENT |
| |
Heat treated product’s are is inspected for proper internal structural formation and Hardness of the Product |
| |
|
| GAUGING |
| |
All Products are checked with gauges for operational fitment |
| |
|
| SHOT BALLAST |
| |
Inspection at Shot Ballasting checks for finishing out put |
| |
|
| ELECTRO PLATING |
| |
Final inspection is carried after electroplating stage. This is the final and detailed inspection carried out manually. |